0700 118 350 contact@instalatorul-dinu.ro Mon–Fri 08–18 · Sat 09–14 · Sun Emergencies only

Copper or plastic pipes

· in category Practical guides

Three short pipe sections, one coppery and two white, beside a pipe cutter on a workbench

When you redo your water plumbing, most of the time you're choosing between copper and plastic. "Plastic" actually covers several things: PPR, which is welded, and PEX or multilayer pipe, which is joined with fittings. Each has its place, and the difference between a system that holds and one that leaks lies more often in the installation than in the material.

Copper

Copper lasts a very long time and stands up to high temperatures, but it's pricier and needs joints made by a steady hand. The pipes are joined with fittings soldered hot, with filler alloy, or with fittings crimped using a special press tool. It looks good when exposed, for example on the connections next to the boiler, and it doesn't warp in the heat. The downsides are the price, the installation time and the fact that a joint soldered in a hurry stays a weak spot for life.

PPR

PPR is the plastic pipe, usually white or green, that's joined by fusion welding: the ends are melted on a welding tool and fuse into a single piece. Done well, the joint is as watertight as the pipe. It's cheap, doesn't rust and is slower to pick up limescale. On the other hand, it expands a lot when hot, so for hot water and heating you use reinforced pipe, with an aluminum or fiber layer, and the run is fixed leaving room for expansion. PPR doesn't bend, so every elbow is a fitting.

PEX and multilayer

Multilayer pipe, with an aluminum layer between two layers of plastic, bends by hand and holds its shape. It's joined with press fittings, with no flame and no welding tool, which makes it good for renovations, tight spaces and underfloor heating. The fittings are the expensive part and the sensitive part: cheap ones, or ones pressed with the wrong tool, are the first to fail.

What I usually choose

There's no "best" in general, only what suits your house and budget. In an apartment with old iron pipes, PPR or multilayer is most often the sensible choice. Where pipes stay exposed or run near a heat source, copper makes sense. What I don't do: I don't mix materials at random and I don't close any pipe into a wall without a pressure test. Before the tiles or the plaster go on, I do the test, and only then do we close it up.

Pipe and riser replacement starts at 400 lei for labor, depending on the run. The final price depends on the length, the number of connections and how hard it is to get to the old pipes, so you find out after an on-site check, with materials listed separately on the quote. If you're not sure yet whether the pipes need replacing, look at the signs it's time to call a plumber.

Call me Book a visit
WebIDexample