0700 118 350 Mon–Fri 08–18 · Sat 09–14 · Sun Emergencies only

How to choose a plumber
you can trust

· in category Plumbing tips

A plumber holding his toolbox, shaking hands with a customer at her front door

A good plumber spares you headaches for years; one picked in a hurry costs you twice, once for the job and once for fixing it. Since I started working for myself, in 2014, I've redone enough jobs to know what I'd look at if I were in your shoes.

You get the price before the work starts

A serious tradesman comes, takes a look and tells you the price before touching anything, with labor and materials written separately. Run from "we'll see at the end": that's where the surprises come from. A clear quote also shows what's included in the job and what isn't, so you don't find out only when it's time to pay that "the pipe wasn't included." With me, the on-site check costs 80 lei and I take it off the total if you accept the job.

Authorized for the work they do

For gas work, the plumber has to be ANRE-authorized for that type of work (ANRE is Romania's energy regulator). It's not a formality: it's about your safety and, with a new boiler, the warranty the manufacturer gives. Ask directly and ask to see the ANRE authorization card. I'm an ANRE-authorized plumber, type EGIU, and I work through my plumbing company, which is ANRE-authorized, type EDIB, and ISCIR-authorized (ISCIR is Romania's inspection authority for boilers and pressure equipment): through it I do the gas boiler installation, with tests at the end, and the commissioning.

It's just as important to know what they don't do. I work only on water, drains and heating. If the job also has an electrical part, for example a new outlet next to the boiler or a separate circuit for the water heater, I recommend a licensed electrician. Someone who does it all "because he's handy" isn't a good sign.

Questions worth asking on the phone

  • How much do the check and the trip cost, and do they come off the job?
  • Do you bring the materials or do I buy them? If you bring them, do you put them on the quote?
  • What guarantee do you give on labor and what does it cover?
  • How long will the job take and when can you start?
  • What happens if you find another problem along the way?

Clear, straight answers say a lot. On the last question, the right answer is "I'll call you and tell you before I do anything extra," not "I'll sort it out and we'll see."

Shows up when promised and answers for the work after

Punctuality says a lot about how someone will work. If they're two hours late for the first appointment without letting you know, the rest will go about the same way. And a labor guarantee shows the person stands behind their work: if a problem comes up because of the way they installed something, they come back and fix it at no extra cost. The guarantee on parts is separate, the one the manufacturer gives.

Also read customers' Google reviews, to see how they've worked for others. Look especially at what people say about cleanliness, about the price and about how they behaved when something didn't work the first time.

The price that's far too low

An offer far below the others usually hides something: second-rate materials, a skipped pressure test, a connection left as is "because it works like that too." You pay the difference later, usually with a stain on your neighbor's ceiling. Don't look for the lowest price, look for the price they can explain to you.

Call me Book a visit
WebIDexample